Umbraco ships two kinds of releases:
For most organisations the LTS line is the only one that really matters. The current LTS is Umbraco 17: released on 27 November 2025, end-of-life on 27 November 2028. The previous one, Umbraco 13, reaches end-of-life on 14 December 2026.
A CMS outside support no longer receives security patches. For a public website that is a direct risk — and for anyone subject to vendor requirements or certifications, it is often simply not allowed.
Upgrading from LTS to LTS is a series of small, predictable steps. Waiting makes the step bigger: packages drift further out of sync, custom code ages along and the knowledge of the original setup evaporates. The most expensive migrations we do are invariably the sites that waited the longest.
We put clients on the current LTS by default and schedule the next step as soon as it ships. That keeps every upgrade small — and keeps the site within support at all times.
Want to know where your site stands? See the support overview per Umbraco version or ask us via support.
Adres
Postbus
Curious what this means for your site? Leave your details and briefly describe what you're running into, and we'll get back to you. We usually respond within one business day.
Prefer direct contact? Feel free to call or email us.
An STS (Standard Term Support) is an interim version with new features, supported for about a year. An LTS (Long Term Support) lasts three years: 24 months with bug fixes and security patches, followed by 12 months with security patches only. For most organisations the LTS line is the only one that really matters.
Umbraco 17, released on 27 November 2025 and supported until 27 November 2028. The previous LTS, Umbraco 13, reaches end-of-life on 14 December 2026.
No more security patches are released, while new vulnerabilities keep being found. For a public website that is a direct risk — and anyone subject to vendor requirements or certifications is often simply not allowed to run on an unsupported version.
No. The STS interim versions can be skipped. Our policy: sites run on the current LTS and the next step is scheduled as soon as the new LTS ships. That keeps every upgrade small and keeps the site within support at all times.